4D Building Information Modeling (4D BIM) integrates a 3D BIM model with schedule-related data in a Common Data Environment (CDE). This process enables intelligent linking of design and timeline, revolutionizing project planning and execution in the construction industry.

At AS Build, our core focus is to provide real-time visualization of construction progress by leveraging precise scheduling and simulation techniques during project development.

What Does 4D BIM Offer?

4D BIM in construction incorporates details like lead times, construction phases, installation sequences, curing periods, and drying allowances. This advanced scheduling method is rapidly gaining traction across the AEC industry, delivering significant benefits to project performance and stakeholder collaboration.

How 4D BIM Scheduling Enhances Construction Projects

4D BIM adds value to construction projects by eliminating uncertainties and improving coordination. Key advantages include:

  • Risk Mitigation: Provides a safer work environment through enhanced team collaboration and communication.
  • Remote Monitoring: Enables stakeholders to track project progress remotely with precise 4D BIM simulations.
  • Improved Visualization: Offers a clear, detailed view of project timelines for better decision-making.
  • Conflict-Free Scheduling: Delivers realistic construction schedules for pre-bid presentations, minimizing conflicts.
  • Reduced On-Site Rework: Eliminates last-minute coordination issues, saving time and resources.

4D BIM Services with AS Build

Our 4D BIM solutions are designed to enhance project efficiency and performance. The implementation process includes:

  1. 3D BIM Model Creation: Developing a detailed 3D model of the project.
  2. Schedule Development: Preparing a project schedule using tools like MS Project or Primavera P6.
  3. Level and Zone Division: Segmenting the 3D BIM model into levels and zones aligned with the project schedule.
  4. Model-Schedule Integration: Linking the 3D BIM model with the schedule data.
  5. 4D BIM Simulation: Simulating the model with time-based associations for enhanced planning and visualization.

At AS Build, we streamline your construction planning with 4D BIM, ensuring a seamless, efficient, and collaborative project lifecycle.